• LinkedIn
  • Facebook
  • Instagram
Contact us at 972-788-4222
RWB Consulting Engineers
  • Home
  • Expertise
    • Design Services
      • MEP Engineering
      • Building Information Modeling (BIM)
      • Cryptocurrency Data Centers
    • Systems
      • Geothermal
      • Central Plants
      • Air Cleaning Technologies
    • Studies and Compliance
      • Short Circuit & Arc Flash
      • Community Storm Shelters
  • Portfolio
    • K-12
    • Higher Education
    • Aviation
      • Airports
      • Flight Training Facilities
    • Municipal
      • Fire Stations
    • Offices
    • Libraries
  • About
    • Leadership
    • Careers
    • Internships
    • Firm History
    • RWB News
  • Contact
  • Menu Menu

im体育电竞app下载

Project Overview

The City of Firsco Central Fire Station opened its doors in late 2006. The project included Frisco Fire Safety Town , a miniature city built to educate children in the community about general safety skills.

Highlights

  • Total Complex: 7.44 Acres
  • New Construction
  • Fire Station, Municipal
  • Budget: $5M

Project Team

Architect – Phelps Wood

Project Details

In 2006, The City of Frisco built a new Central Fire Station in place of the older facility. Included in the replacement is the Frisco Fire Safety Town, a miniature city built to help educate children in the community on general fire safety skills. Children are able to ride bikes up and down miniature streets, visit miniature structures and gain hands-on experience about fire safety. The total cost to construct the facility was just over $5M.

Both structures were designed with sustainability in mind and included water use reduction measures in the plumbing systems design and enhancements to the air conditioning systems by increased air filtration, outside air control, and relative humidity control.

The heating, ventilating and air conditioning (HVAC) systems consisted of split direct expansion systems with duct outside air controlled by automatic dampers, some of which include carbon dioxide sensor demand control ventilation. Higher efficiency filters were used and relative humidity sensors interfaced with a hot gas reheat coil for direct relative humidity control.

Source control exhaust was used in the Apparatus bay to prevent or limit diesel exhaust fumes from entering the building. Sensors were used in the Apparatus Bay to detect levels of undesirable fumes to energize appropriate ventilation systems.

There was also an Emergency Operations Center (EOC) incorporated into this station for the main base of operations for city emergency response forces.

The entire facility is supplied with an emergency generator that serves 100% of the facility.

Previous Next
1 2 3 4 5
City of Frisco Central Fire Station
City of Frisco Central Fire Station
City of Frisco Central Fire Station
City of Frisco Central Fire Station
City of Frisco Central Fire Station

Facts about Frisco Fire Safety Town

  • The outdoor town is built to a 5/8’s scale
  • The facility is staffed with a Community Education Coordinator, two Safety Educators. Additionally, one off-duty Firefighter will be present. The Fire Fighters work on a rotating schedule.
  • Further staffing provided by volunteers, totaling about 20 volunteers a week.
  • Students and Families can enjoy riding around the miniature town on one of the 26 Jeeps and 44 Bikes provided.
City of Frisco Central Fire Station

Similar Projects

The exterior of Farmers Branch Fire Station No 2

City of Farmers Branch Fire Station 2

Rendering of the Round Rock Public Library

Round Rock Public Library

Frisco Public Library West Enterance

Frisco Public Library

Princeton Fire Station Truck

Princeton Fire Station No. 3

RWB Consulting Engineers

CBS Tower, Suite 1188
12088 N. Central Expressway, Dallas, TX 75888

Phone:  972-788-4888
View Location on Google Map

Hours: Monday – Friday
8 a.m. – 5 p.m.

TBPE Registered Firm# 2176

This site is protected by reCAPTCHA and the Google  Privacy Policy  and  Terms of Service  apply.

网站地图

Get in Touch

LinkedIn Icon     Facebook Icon

Sign up for our newsletter

You can only submit this form once.

Recent News

  • Lake Highlands Middle School Rendering RWB Team Celebrates the Groundbreaking of Lake Highlands Middle School September 13, 2022 - 11:19 am
  • Engineering Internships Welcome 2022 Summer Interns July 5, 2022 - 6:06 pm
  • RWB Summer 2022 Newsletter Summer 2022 Newsletter June 30, 2022 - 9:14 am
  • Vanguard High School Exterior RWB Honored with 2022 ASHRAE Technology Awards June 2, 2022 - 4:35 pm
  • Collin College Wylie Campus Collin College Wylie Campus Wins IIDA Design Excellence Award May 11, 2022 - 8:17 am
Copyright 2022 | All Rights Reserved | RWB Consulting Engineers
  • LinkedIn
  • Facebook
  • Instagram
  • Share Documents
The Stayton at Museum Way The Stayton at Museum Way - MEP Designed by RWB Consulting Engineers American Airlines Flight Training Academy Central Utility Plant American Airlines Flight Training Academy Central Utility Plant
Scroll to top

友情链: im电竞竞猜官网,im体育电竞登录-体育电竞官网 | 2022IM电竞官网注册-爱游戏IM电竞网址-在线电竞竞猜 | im电竞中国官方入口 _ im电竞官方版APP下载 _ 直播竞猜电竞送88 | 新IM电竞下比赛的网址 im电竞官网登录|电竞竞猜官方网站 | im电竞百度知道-im电竞在线官网首页 电竞竞猜投注 | IM电竞足球|im电竞最近怎么登录上去 - 电竞竞猜投注排行 | 新IM电竞平台首页,IM电竞注册官方网站_电竞竞猜官方 |