• LinkedIn
  • Facebook
  • Instagram
Contact us at 972-788-4222
RWB Consulting Engineers
  • Home
  • Expertise
    • Design Services
      • MEP Engineering
      • Building Information Modeling (BIM)
      • Cryptocurrency Data Centers
    • Systems
      • Geothermal
      • Central Plants
      • Air Cleaning Technologies
    • Studies and Compliance
      • Short Circuit & Arc Flash
      • Community Storm Shelters
  • Portfolio
    • K-12
    • Higher Education
    • Aviation
      • Airports
      • Flight Training Facilities
    • Municipal
      • Fire Stations
    • Offices
    • Libraries
  • About
    • Leadership
    • Careers
    • Internships
    • Firm History
    • RWB News
  • Contact
  • Menu Menu

im电竞app平台下载

Project Overview

This new Fort Worth middle school is uniquely designed with huddle spaces throughout the facility to inspire creativity though collaboration.

Highlights

  • 166,000 SF
  • New Construction
  • K-12, Education
  • Budget: $41.9M

Project Team

Architect – VLK Architects
General Contractor – Pogue Construction

Awards

Spring 2020 Learning By Design

Outstanding Project Award

Project Details

Marine Creek Middle School is a new-construction K-12 facility in Fort Worth, Texas. The client, Eagle Mountain-Saginaw Independent School District, sought to bring a modern learning environment to their students in 6-8 th grade. The facility opened in August 2019 with a capacity for 1,200 students and staff. RWB provided the MEP engineering design on this award-winning project.

HVAC Design Spotlight: Geothermal System

A geothermal HVAC system offers many benefits for middle schools. Two of the most important benefits are the longevity and energy-efficiency of the system. Designed correctly, a geothermal system can operate for decades without the need to replace expensive equipment.

Preliminary Evaluation: Is Geothermal a Good Fit?

Geothermal has limitations in application. We must take the size of the site and conditions of the soil into consideration. With Marine Creek Middle School, the land area available for a geothermal well field was limited.

On every project, the RWB team reviews all potential HVAC solutions–keeping in mind the best solution for the owner. We took several steps to assess the viability of a geothermal system on this project, including:

  • Calculated a preliminary load for the building to determine the capacity required.
  • Reviewed the site plans and the geotechnical survey of the ground and soil conditions.
  • Determined which areas were unsuitable for geothermal wells, like utility easements or landscaping areas.
  • Drafted a design of well field placement on the site, keeping in mind the separation required between individual wells which is critical to the operational life cycle of the system.

After completing this analysis, we determined there was not enough space on-site to serve the entire building with a geothermal system.

Hybrid Geothermal: The Solution to Maximize Energy Savings

The RWB mechanical team proposed a hybrid geothermal design. A mechanical design is a hybrid if it is a blend of two or more HVAC systems. With a hybrid design, owners can realize the benefits of a geothermal HVAC system, even if it is not possible to use it for the entire project. With this project, the hybrid design is composed of:

  • Geothermal system serving the academic and administration areas
  • Rooftop units (RTUs) serving the cafeteria, kitchen, athletic facilities, and fine arts spaces

With this design, the geothermal system is serving the areas where it provided the most benefit. A geothermal well field is most suited for spaces like classrooms that will have regular, repeated load cycles. Rooftop units are an appropriate solution for the other spaces that have more irregular schedules. This hybrid system is the best of both worlds for EMS ISD.

Marine Creek Middle School - Geothermal Water Source Heat Pumps
Marine Creek Middle School - Geothermal Water Source Heat Pumps
Marine Creek Middle School - Geothermal Piping
Marine Creek Middle School - Geothermal Piping
Marine Creek Middle School - Goethermal Valves
Marine Creek Middle School - Goethermal Valves
Previous Next
1 2 3 4 5
Marine Creek Middle School - Equipment
Marine Creek Middle School - Electrical Panels
Marine Creek Middle School - Lighting and Diffusers
Marine Creek Middle School - Gymnasium
Marine Creek Middle School - Geothermal Water Source Heat Pumps

Electrical Design Spotlight: Making Maintenance Easier

To meet life-safety requirements in building codes, back lit signage like emergency exit signs require backup power. Emergency lighting is always connected to building power, although having battery power available as a secondary source is essential. This way even if power is lost in the building, the signage remains illuminated by the battery.

Most buildings have battery backup in every space of the building. In fact, many emergency exit signs and emergency lighting have backup power via your everyday nickel cadmium (NiCad) batteries. The challenge for facility managers is ensuring those batteries have adequate charge. A sizeable building like a middle school has hundreds of backup batteries that require testing and replacement on a regular schedule. It amplifies the problem for organizations like school districts that manage multiple facilities.

The Solution: Centralized Backup Battery Power

To address this problem, RWB implemented a unique approach for the electrical design.

First, we equipped Marine Creek Middle School with LED emergency signage and lighting. LED fixtures are not only energy efficient, they also emit a lot of light! These LED fixtures are connected to low voltage building power.

For the backup system, RWB used a centralized battery backup system. Instead of batteries in every room, there is just one central battery cabinet on each wing and floor of the building. By utilizing a centralized battery system instead of individual batteries, we reduced the building maintenance required.

Marine Creek Middle School - Building Exterior Front

Putting the Owner First

Marine Creek Middle School – Eagle Mountain-Saginaw ISD

At RWB, we take time to listen to our clients and understand their needs. Our team weighed the desires of the client when designing the MEP system for the school:

  • Delivered the project on-time and on-schedule, despite a shorter than normal time frame
  • The modern architectural design required extra coordination effort among all the trades to ensure space and fit of building systems
  • Reduced the equipment footprint and cost by applying our in-depth understanding of local building codes and standards like ASHRAE 90.1-2013
  • Minimized the size and cost of ductwork by implementing an outside air pre-treatment system

Similar Projects

Ray Braswell High School in Denton Texas is a geothermal project designed by RWB Consulting Engineers

Ray Braswell High School

Arlington ISD Ag Center

Arlington ISD Agricultural Science Center

Ralph Bunche Elementary School Exterior Photo

Ralph Bunche Elementary School

Boswell High School

Boswell High School

An image at dusk of Midlothian Heritage High School

Midlothian Heritage High School

RWB Consulting Engineers

CBS Tower, Suite 1188
12088 N. Central Expressway, Dallas, TX 75888

Phone:  972-788-4888
View Location on Google Map

Hours: Monday – Friday
8 a.m. – 5 p.m.

TBPE Registered Firm# 2176

This site is protected by reCAPTCHA and the Google  Privacy Policy  and  Terms of Service  apply.

网站地图

Get in Touch

LinkedIn Icon     Facebook Icon

Sign up for our newsletter

You can only submit this form once.

Recent News

  • Lake Highlands Middle School Rendering RWB Team Celebrates the Groundbreaking of Lake Highlands Middle School September 13, 2022 - 11:19 am
  • Engineering Internships Welcome 2022 Summer Interns July 5, 2022 - 6:06 pm
  • RWB Summer 2022 Newsletter Summer 2022 Newsletter June 30, 2022 - 9:14 am
  • Vanguard High School Exterior RWB Honored with 2022 ASHRAE Technology Awards June 2, 2022 - 4:35 pm
  • Collin College Wylie Campus Collin College Wylie Campus Wins IIDA Design Excellence Award May 11, 2022 - 8:17 am
Copyright 2022 | All Rights Reserved | RWB Consulting Engineers
  • LinkedIn
  • Facebook
  • Instagram
  • Share Documents
American Airlines Central Campus Central Utility Plant (CUP) American Airlines Central Campus CUP Filtration Air Cleaning Systems