• LinkedIn
  • Facebook
  • Instagram
Contact us at 972-788-4222
RWB Consulting Engineers
  • Home
  • Expertise
    • Design Services
      • MEP Engineering
      • Building Information Modeling (BIM)
      • Cryptocurrency Data Centers
    • Systems
      • Geothermal
      • Central Plants
      • Air Cleaning Technologies
    • Studies and Compliance
      • Short Circuit & Arc Flash
      • Community Storm Shelters
  • Portfolio
    • K-12
    • Higher Education
    • Aviation
      • Airports
      • Flight Training Facilities
    • Municipal
      • Fire Stations
    • Offices
    • Libraries
  • About
    • Leadership
    • Careers
    • Internships
    • Firm History
    • RWB News
  • Contact
  • Menu Menu

im电竞app平台下载

Project Overview

Midlothian Heritage High School is a 250,000 square-foot main education building. Plus, some smaller structures were part of the project. Those extra buildings included:

  • Field house
  • An agricultural shop
  • Concession buildings for athletic fields
  • And more!

RWB provided the design engineering services for this high school project.

Highlights

  • 250,000 SF
  • New Construction
  • K-12, Education
  • Budget: $54M
  • Designed in Revit MEP

Project Team

Architect – VLK Architects

General Contractor – Balfour Beatty

Project Details

As experienced designers of Dallas/Fort Worth K-12 projects , RWB offered many design options for Midlothian Heritage High School. MEP designs are not created equal. School districts must focus on features that are most important to them. Some of the variables include:

  • Efficiency
  • Initial cost
  • Ongoing operational costs
  • Maintenance requirements
  • Sound levels

RWB sought out system cost and efficiency data MEP designs in other school districts. We gave consideration to three system designs: Rooftop units (RTUs); four-pipe chilled and hot water systems; and a geothermal system . The design team narrowed down the options to two systems; 4-pipe and geothermal.

We compared the two design approaches on three items. 1) system efficiency, 2) installation cost, and 3) maintenance cost. This detailed analysis included items that are commonly overlooked. Some examples include an annual maintenance contract, water usage, and chemical usage costs. These costs vary depending on the system type so it is important to include them in analysis.

RWB compiled and presented the findings to the design team. The full design team included the architect, facilities team, and school board. In the end, the team decided on a geothermal system.

Energy Efficient Design Engineering for Midlothian Heritage

Because this project is a public building, keeping ongoing operational costs low was a priority . Most K-12 schools have a limited budget for ongoing utility costs. So, engineering the building to use less energy is top-of-mind when we work on these projects. RWB investigated opportunities to incorporate efficient design elements to Midlothian Heritage High School. Our plumbing and engineering consulting teams optimized many portions of the design. Some examples include:
  • High efficiency lighting design with occupancy sensors and multi-level switching throughout.
  • The design team adjusted architectural and accent lighting to limit energy usage.
  • Low flow plumbing fixtures to reduce water consumption.
  • Water-to-water heat pumps to pre-heat the main water heaters. The water heaters primarily serve the locker rooms and kitchen in the main building.
Also, RWB provided options to the School District for building site lighting. We designed two versions of site lighting. The first design was a baseline design using metal halides. The alternate design utilized LEDs.

Geothermal Design

RWB has experienced professionals in geothermal design. Not all design firms are able to confidently deliver a geothermal design that works. RWB has many successful geothermal engineering projects in our portfolio, including Midlothian Heritage High School.

Geothermal Services

Revit MEP

The Midlothian Heritage High School project was designed entirely in Revit MEP. Modeling in 3D requires extra coordination across disciplines and with our partners. RWB is proud to have a team of highly-trained engineers in all disciplines to support design projects in Revit.

Revit MEP Services

MEP Design Services

With over 50 engineers and designs on-staff, RWB Consulting Engineers has the expertise and capacity to take on any K-12 school project. Our team understands the unique needs of education projects. We can provide expertise in K-12 mechanical, electrical, or plumbing engineering.

MEP Design Services

Similar Projects

Lake Highlands Middle School

Lake Highlands Middle School

Boswell High School

Boswell High School

Lake Highlands Freshman Center

Lake Highlands High School Freshman Center

Arlington ISD Ag Center

Arlington ISD Agricultural Science Center

Community High School Angle

Community High School

RWB Consulting Engineers

CBS Tower, Suite 1188
12088 N. Central Expressway, Dallas, TX 75888

Phone:  972-788-4888
View Location on Google Map

Hours: Monday – Friday
8 a.m. – 5 p.m.

TBPE Registered Firm# 2176

This site is protected by reCAPTCHA and the Google  Privacy Policy  and  Terms of Service  apply.

网站地图

Get in Touch

LinkedIn Icon     Facebook Icon

Sign up for our newsletter

You can only submit this form once.

Recent News

  • Lake Highlands Middle School Rendering RWB Team Celebrates the Groundbreaking of Lake Highlands Middle School September 13, 2022 - 11:19 am
  • Engineering Internships Welcome 2022 Summer Interns July 5, 2022 - 6:06 pm
  • RWB Summer 2022 Newsletter Summer 2022 Newsletter June 30, 2022 - 9:14 am
  • Vanguard High School Exterior RWB Honored with 2022 ASHRAE Technology Awards June 2, 2022 - 4:35 pm
  • Collin College Wylie Campus Collin College Wylie Campus Wins IIDA Design Excellence Award May 11, 2022 - 8:17 am
Copyright 2022 | All Rights Reserved | RWB Consulting Engineers
  • LinkedIn
  • Facebook
  • Instagram
  • Share Documents
American Airlines flight simulators exterior American Airlines Flight Training Academy
Scroll to top

友情链: im电竞竞猜官网,im体育电竞登录-体育电竞官网 | 2022IM电竞官网注册-爱游戏IM电竞网址-在线电竞竞猜 | im电竞中国官方入口 _ im电竞官方版APP下载 _ 直播竞猜电竞送88 | 新IM电竞下比赛的网址 im电竞官网登录|电竞竞猜官方网站 | im电竞百度知道-im电竞在线官网首页 电竞竞猜投注 | IM电竞足球|im电竞最近怎么登录上去 - 电竞竞猜投注排行 | 新IM电竞平台首页,IM电竞注册官方网站_电竞竞猜官方 |