• LinkedIn
  • Facebook
  • Instagram
Contact us at 972-788-4222
RWB Consulting Engineers
  • Home
  • Expertise
    • Design Services
      • MEP Engineering
      • Building Information Modeling (BIM)
      • Cryptocurrency Data Centers
    • Systems
      • Geothermal
      • Central Plants
      • Air Cleaning Technologies
    • Studies and Compliance
      • Short Circuit & Arc Flash
      • Community Storm Shelters
  • Portfolio
    • K-12
    • Higher Education
    • Aviation
      • Airports
      • Flight Training Facilities
    • Municipal
      • Fire Stations
    • Offices
    • Libraries
  • About
    • Leadership
    • Careers
    • Internships
    • Firm History
    • RWB News
  • Contact
  • Menu Menu

im电竞下载ios

Project Overview

In 2019, Arlington ISD opened its new 28,000 square-foot Agricultural Science Center to students and faculty. There, students can learn hands-on about all things related to agriculture.

Highlights

  • 28,000 SF
  • New Construction
  • K-12, Education
  • Budget: $5.9M
  • Designed in Revit MEP

Project Team

Architect – VLK Architects

General Contractor – Ratcliff Companies

Project Details

The district’s new 28,000 square-foot Agricultural Science Center allows students and teachers the opportunity to have a hands-on learning experience in the realm of agriculture education.

The structure’s distinctive design operates as an indoor/outdoor facility. Interior doors open directly to the outdoors which allows for good ventilation and airflow through the corridor. Included in the design are two classroom spaces, administration areas, animal pens, open-air barns, and a metal shop was added.

The Arlington ISD Agricultural Science Center is a net-zero energy building . In this case, the building is producing more energy than it consumes. The Energy Management System (EMS) is tied to all the mechanical components and tracks the daily usage of the facility. The electricity produced is stored in a series of inverters and all extra is pushed out to the local power grid. On Texas’s warmest days, the electricity produced from the solar array is about one megawatt. The wind turbine produces about 1.7 kilowatts of electricity per day.

The energy-efficient products that are in-use at the Center:

  • Roof-Mounted photovoltaic (PV) Solar Array
  • Wind Turbine
  • Rainwater Collection Tanks

The PV array and wind turbine help with energy production. A bi-directional meter attached to the PV array allows the building to buy or sell electricity to the local utility. The four rainwater storage collection tanks help with irrigation and other internal barn purposes.

RWB was awarded the 2021 Building Technology Award from ASHRAE Dallas for our innovative work on this project.

Arlington ISD Ag Center

RWB’s Work in Arlington ISD

RWB began working with Arlington ISD in 1995. We have completed work on almost every campus in the district. RWB has provided many K-12 facilities with MEP services on New Construction, Additions and Renovations and various types of MEP Upgrades.

RWB is currently performing work on these schools:

  • Atherton Elementary School
  • Foster Elementary School
  • Johns Elementary School

About Arlington ISD

Arlington ISD serves nearly 60,000 students in North Texas over 79 different campuses, making it the 13th largest school district in Texas. Arlington ISD offers many programs including the international Baccalaureate World School Program, an award-winning special education program, and co-curricular and extracurricular activities. Students can participate in a number of Fine Arts activities including Band, Choir, Orchestra, Dance and Theater. Athletic teams vary from archery, to wrestling, including: basketball, baseball, cross country, football, gymnastics, golf, tennis, track and field, soccer, swimming, strength and conditioning and volleyball.

Similar Projects

Marine Creek Middle School - Building Exterior

Marine Creek Middle School

Lake Highlands Freshman Center

Lake Highlands High School Freshman Center

Lake Highlands Middle School

Lake Highlands Middle School

An image at dusk of Midlothian Heritage High School

Midlothian Heritage High School

Vanguard High School

RWB Consulting Engineers

CBS Tower, Suite 1188
12088 N. Central Expressway, Dallas, TX 75888

Phone:  972-788-4888
View Location on Google Map

Hours: Monday – Friday
8 a.m. – 5 p.m.

TBPE Registered Firm# 2176

This site is protected by reCAPTCHA and the Google  Privacy Policy  and  Terms of Service  apply.

网站地图

Get in Touch

LinkedIn Icon     Facebook Icon

Sign up for our newsletter

You can only submit this form once.

Recent News

  • Lake Highlands Middle School Rendering RWB Team Celebrates the Groundbreaking of Lake Highlands Middle School September 13, 2022 - 11:19 am
  • Engineering Internships Welcome 2022 Summer Interns July 5, 2022 - 6:06 pm
  • RWB Summer 2022 Newsletter Summer 2022 Newsletter June 30, 2022 - 9:14 am
  • Vanguard High School Exterior RWB Honored with 2022 ASHRAE Technology Awards June 2, 2022 - 4:35 pm
  • Collin College Wylie Campus Collin College Wylie Campus Wins IIDA Design Excellence Award May 11, 2022 - 8:17 am
Copyright 2022 | All Rights Reserved | RWB Consulting Engineers
  • LinkedIn
  • Facebook
  • Instagram
  • Share Documents
Collin College Wylie Campus Collin College Wylie Campus Lake Highlands Freshman Center Lake Highlands High School Freshman Center
Scroll to top

友情链: im电竞竞猜官网,im体育电竞登录-体育电竞官网 | 2022IM电竞官网注册-爱游戏IM电竞网址-在线电竞竞猜 | im电竞中国官方入口 _ im电竞官方版APP下载 _ 直播竞猜电竞送88 | 新IM电竞下比赛的网址 im电竞官网登录|电竞竞猜官方网站 | im电竞百度知道-im电竞在线官网首页 电竞竞猜投注 | IM电竞足球|im电竞最近怎么登录上去 - 电竞竞猜投注排行 | 新IM电竞平台首页,IM电竞注册官方网站_电竞竞猜官方 |