• LinkedIn
  • Facebook
  • Instagram
Contact us at 972-788-4222
RWB Consulting Engineers
  • Home
  • Expertise
    • Design Services
      • MEP Engineering
      • Building Information Modeling (BIM)
      • Cryptocurrency Data Centers
    • Systems
      • Geothermal
      • Central Plants
      • Air Cleaning Technologies
    • Studies and Compliance
      • Short Circuit & Arc Flash
      • Community Storm Shelters
  • Portfolio
    • K-12
    • Higher Education
    • Aviation
      • Airports
      • Flight Training Facilities
    • Municipal
      • Fire Stations
    • Offices
    • Libraries
  • About
    • Leadership
    • Careers
    • Internships
    • Firm History
    • RWB News
  • Contact
  • Menu Menu

im电竞app在哪里下载

Project Overview

The former Freshman Center building at Lake Highlands High School in Richardson ISD received a much-needed HVAC Upgrade. Now named “Building H”, the facility’s multiple performance issues were addressed by the RWB mechanical team.

Highlights

  • HVAC Renovation
  • K-12, Education
  • Budget: $6.6M

Project Team

Owner – Richardson ISD

Contractor – United Mechanical

Project Details

Lake Highlands High School serves over 2,700 students in Richardson ISD. Freshman students who attend class in Lake Highlands High School “Building H” can enjoy a more comfortable learning environment as the building received a major HVAC Upgrade. RWB was recognized with the 2021 Building Technology Award from ASHRAE Dallas for our design work on this project.

The satellite campus, built in 1997 had original building equipment that was nearing failure and unable to meet the demands of the changing student population. With a 2016 school bond approved by Richardson residents, our team was able to examine and address multiple performance issues. 

RWB eliminated the existing designs that were not beneficial to the building’s performance and replaced them with more energy-efficient enhancements. 

The existing building design was a constant-volume chilled water system serving air handlers throughout the building. To address the issue, RWB re-zoned the building from an east/west to a north/south configuration to allow for a more even load distribution. RWB was able to reduce the size of some AHUs by as much as 50% by combining like zones.

Eco-friendly equipment was installed and scheduled accordingly to space utilization while using the same existing ductwork. 

Performance and Other Issues included:

  • Overworked AHU’s due to zero zone diversity
  • Lack of heating/inadequately sized heating in the building
  • Inadequate airflow in the gym
  • Inaccessible VAV air terminal units in the auditorium
  • Complicated air distribution systems 
  • Unconditioned main staircase
  • Sectioned off science labs using independent systems

Additional issues included redesigning the domestic hot water system with a recirculating loop system as the original design had no hot water return line for circulation. All faucets in the building now have hot water running to them.

With RWB’s re-design, the team was able to simultaneously improve performance and reduce to load size of the MEP equipment in the building.

Previous Next
1 2 3
Lake Highlands High School Before and After Chiller
Lake Highlands High School Ductwork in Gymnasium
Lake Highlands High School Freshman Center Pumps

Other Work at Lake Highlands High School

RWB has performed many additions, renovations and new construction projects. A few projects included updating all the HVAC equipment on the main school building and common outdoor areas. LHHS recently built their own Multipurpose Athletic Center which includes a weight room, locker room and an indoor 75-yard football field. Additionally, RWB performed an auditorium and kitchen renovation.

RWB’s Work in RISD

RWB has served Richardson ISD since 2004. We have completed work on 75% or more facilities in the district; from New Construction, Additions and Renovations and various types of MEP Upgrades.

Similar Projects

Arlington ISD Ag Center

Arlington ISD Agricultural Science Center

Gym at Ridgeview ES

Ridgeview Elementary School

Marine Creek Middle School - Building Exterior

Marine Creek Middle School

Ralph Bunche Elementary School Exterior Photo

Ralph Bunche Elementary School

Vanguard High School

RWB Consulting Engineers

CBS Tower, Suite 1188
12088 N. Central Expressway, Dallas, TX 75888

Phone:  972-788-4888
View Location on Google Map

Hours: Monday – Friday
8 a.m. – 5 p.m.

TBPE Registered Firm# 2176

This site is protected by reCAPTCHA and the Google  Privacy Policy  and  Terms of Service  apply.

网站地图

Get in Touch

LinkedIn Icon     Facebook Icon

Sign up for our newsletter

You can only submit this form once.

Recent News

  • Lake Highlands Middle School Rendering RWB Team Celebrates the Groundbreaking of Lake Highlands Middle School September 13, 2022 - 11:19 am
  • Engineering Internships Welcome 2022 Summer Interns July 5, 2022 - 6:06 pm
  • RWB Summer 2022 Newsletter Summer 2022 Newsletter June 30, 2022 - 9:14 am
  • Vanguard High School Exterior RWB Honored with 2022 ASHRAE Technology Awards June 2, 2022 - 4:35 pm
  • Collin College Wylie Campus Collin College Wylie Campus Wins IIDA Design Excellence Award May 11, 2022 - 8:17 am
Copyright 2022 | All Rights Reserved | RWB Consulting Engineers
  • LinkedIn
  • Facebook
  • Instagram
  • Share Documents
Arlington ISD Agricultural Science Center Arlington ISD Ag Center Building Information Modeling - BIM Building Information Modeling (BIM)
Scroll to top

友情链: im电竞竞猜官网,im体育电竞登录-体育电竞官网 | 2022IM电竞官网注册-爱游戏IM电竞网址-在线电竞竞猜 | im电竞中国官方入口 _ im电竞官方版APP下载 _ 直播竞猜电竞送88 | 新IM电竞下比赛的网址 im电竞官网登录|电竞竞猜官方网站 | im电竞百度知道-im电竞在线官网首页 电竞竞猜投注 | IM电竞足球|im电竞最近怎么登录上去 - 电竞竞猜投注排行 | 新IM电竞平台首页,IM电竞注册官方网站_电竞竞猜官方 |