• LinkedIn
  • Facebook
  • Instagram
Contact us at 972-788-4222
RWB Consulting Engineers
  • Home
  • Expertise
    • Design Services
      • MEP Engineering
      • Building Information Modeling (BIM)
      • Cryptocurrency Data Centers
    • Systems
      • Geothermal
      • Central Plants
      • Air Cleaning Technologies
    • Studies and Compliance
      • Short Circuit & Arc Flash
      • Community Storm Shelters
  • Portfolio
    • K-12
    • Higher Education
    • Aviation
      • Airports
      • Flight Training Facilities
    • Municipal
      • Fire Stations
    • Offices
    • Libraries
  • About
    • Leadership
    • Careers
    • Internships
    • Firm History
    • RWB News
  • Contact
  • Menu Menu

im电竞app官网

Project Overview

The High C Gates project at DFW airport is using the latest tech innovations to improve the travel experience.

Highlights

  • Aviation and Airports
  • Construction Cost: $215M
  • Construction Start Date: 7/1/2021
  • Design Start Date: 9/1/2020

Project Details

Located at the south end of Terminal C, Gates C35-C39 were built utilizing the latest innovation in modular construction and engineering. The gates were constructed offsite, then transported overnight into place to allow for the inside finishes to begin. These new gates enhance the customer experience with innovative technology such as energy efficient, dynamic glass windows that tint in response to the sun and smart restrooms. The gate lounges feature large digital information screens that feature flight information for that gate.

In the News

  • DFW Airport steps into the future of travel with new amenities

    CBS News DFW (August 4, 2022)

  • A Look At Dallas Fort Worth’s New High-C Gates

    Simple Flying (June 30, 2022)

  • DFW Airport opening sleek expansion with summer travel rush arriving

    Dallas Morning News (May 31, 2022)

Previous Next
1 2 3 4 5
American Airlines High C Gates
American Airlines High C Gates
American Airlines High C Gates
DFW High C Gates
American Airlines High C Gates

Learn more about our experience with aviation.

Take Off

Construction: DFW High C Gates

The new, five-gate concourse was built in prefabricated modules, which were transported to the terminal and put together on-site. The unique construction process saves time and money, and is a first for a U.S. airport. Check out this video of the construction as it was in-progress:

Similar Projects

American Airlines Flight Training Academy Central Utility Plant

American Airlines Flight Training Academy Central Utility Plant

American Airlines High C Gates

DFW Airport High C Gates

Southwest Airlines Wings

Southwest Airlines Wings

American Airlines flight simulators exterior

American Airlines Flight Training Academy

American Airlines Central Campus CUP

American Airlines Central Campus Central Utility Plant (CUP)

RWB Consulting Engineers

CBS Tower, Suite 1188
12088 N. Central Expressway, Dallas, TX 75888

Phone:  972-788-4888
View Location on Google Map

Hours: Monday – Friday
8 a.m. – 5 p.m.

TBPE Registered Firm# 2176

This site is protected by reCAPTCHA and the Google  Privacy Policy  and  Terms of Service  apply.

网站地图

Get in Touch

LinkedIn Icon     Facebook Icon

Sign up for our newsletter

You can only submit this form once.

Recent News

  • Lake Highlands Middle School Rendering RWB Team Celebrates the Groundbreaking of Lake Highlands Middle School September 13, 2022 - 11:19 am
  • Engineering Internships Welcome 2022 Summer Interns July 5, 2022 - 6:06 pm
  • RWB Summer 2022 Newsletter Summer 2022 Newsletter June 30, 2022 - 9:14 am
  • Vanguard High School Exterior RWB Honored with 2022 ASHRAE Technology Awards June 2, 2022 - 4:35 pm
  • Collin College Wylie Campus Collin College Wylie Campus Wins IIDA Design Excellence Award May 11, 2022 - 8:17 am
Copyright 2022 | All Rights Reserved | RWB Consulting Engineers
  • LinkedIn
  • Facebook
  • Instagram
  • Share Documents
Boswell High School Boswell High School Lake Highlands Middle School Lake Highlands Middle School
Scroll to top

友情链: im电竞竞猜官网,im体育电竞登录-体育电竞官网 | 2022IM电竞官网注册-爱游戏IM电竞网址-在线电竞竞猜 | im电竞中国官方入口 _ im电竞官方版APP下载 _ 直播竞猜电竞送88 | 新IM电竞下比赛的网址 im电竞官网登录|电竞竞猜官方网站 | im电竞百度知道-im电竞在线官网首页 电竞竞猜投注 | IM电竞足球|im电竞最近怎么登录上去 - 电竞竞猜投注排行 | 新IM电竞平台首页,IM电竞注册官方网站_电竞竞猜官方 |